Copperfield House Barton ‐ Residential Kitchen Installation

Having held the maintenance contract for a number of years after the liquidation of the builder during the development of this historic Hopper Building, we are the residents' first choice for maintenance and new development projects.

This old building which used to be a bicycle factory and warehouse was developed into a number of apartments, many of which are unusual designs filling the cellar space of the old warehouse.

No damp proofing systems were installed during the redevelopment which meant the cellar apartments were subject to rising damp, in particular Number 5. We were appointed the job of stripping the lower floor of the apartment and treating the affected areas before reinstating all walls and installing a new high spec kitchen with granite worktops, under floor heating and re tiling the full lower floor area.

Once the areas had been treated we began the reinstatement of walls and the kitchen, we then laid the under floor heating. After working closely with the customer and listening to their needs, we delivered the finished job on time and within budget.

Our good wishes to all of your team. The job of damp proofing our apartment and refitting the kitchen area along with the new under floor heating was done to a high standard. Everyone who has seen the finished result has been impressed with it.

We hope your company goes from strength to strength. As customers we were very happy with the way you dealt with us and the way you handled our suppliers on our behalf to obtain us a good deal on all the products used.

Thank you once again.

Alan & Liz Mawer

Copperfield House Barton Copperfield House Barton 2 Copperfield House Barton 3